Skip to content

Manage a downgrade

Before you begin

Role
Owner to choose which projects keep answering.

A workspace moves to a lower plan when its subscription ends, whether you cancelled it or it ended unpaid, and its add-ons end with it. Nothing you made is deleted: what no longer fits is kept but frozen, and you choose which projects keep answering. The rules are in Changing plans.

The workspace’s billing contact gets an email from MockHub when a cancellation is made or withdrawn, and when the subscription ends, with the dates and what stops.

Everything you made stays. Every project, mock, scenario and setting is kept, even above the new plan’s limits. You cannot add more of anything that is over its limit. The Subscription page says what is over. Under Usage, This workspace is over its plan limits. lists the projects, custom domains and members above the plan, with the count and what the plan allows. Other ceilings, such as mocks, webhooks and chaos profiles, are not listed there, but creating more of them is refused.

Projects keep answering for a while. Every reduction of the project limit gives the unarchived projects seven days, until the date in “Project limit grace ends …”. After that, only the oldest unarchived projects within the limit answer; the others return 403. Removing project slots bought as add-ons is a reduction too, and its seven days start when the period they were paid for ends.

Members and custom domains above the new limit stay. Every member keeps their access and role, and every Owner stays an Owner, even beyond the number of Owners the new plan allows. You cannot invite anyone, make anyone an Owner or add a domain until the workspace is back within the limit, and a pending invitation can be accepted only while the members alone leave a seat free.

Projects on custom domains return 403 when the new plan does not include custom domains. Move them to a shared domain, or upgrade, to make them answer again.

Other features the new plan leaves out stop working. What you set up for them is kept, and works again after an upgrade. The limits page lists what each plan includes. Rate limits change at once. The request allowances per month, day, hour and second become the new plan’s, and requests already counted stay counted. Request logs and insights older than the new plan keeps stay for at least 30 days after the downgrade, then are removed. The new plan’s log storage limits apply at once: if the workspace holds more logs than they allow, the oldest go without waiting. Mock version history keeps its older versions until a mock is next saved. Then only as many as the new plan keeps remain.

  1. Open Projects, and open a project that should stop answering.

  2. Open its Settings tab.

  3. Under Archive this project, select Archive project.

  4. Select Archive project to confirm.

Repeat until the unarchived projects fit the plan: the oldest of them answer. To bring a project back, select Restore project in the same place, and Restore project again to confirm. It answers again if it is among the oldest unarchived projects within the limit; restoring a project older than the ones answering moves the newest of them out.

The Projects list marks each project Active, Outside active allowance or Archived, in the Status column of the table layout, and only the active ones answer. A project that does not answer carries its tag beside its heading too, and its Mocks tab says that none of its mocks answer, since each mock still reads Active or Inactive as it was set. The others keep their mocks and settings, which stay readable and can be copied as a configuration document.

  • Each reduction starts a fresh project grace period. An upgrade clears its deadline, and an expired deadline is no longer shown.
  • Archived projects still count towards the project limit, so This workspace is over its plan limits. stays until you delete projects or upgrade; see Delete or archive a project. Archiving decides which projects answer, not how many you can create.
  • Only an Owner can archive and restore projects.
  • After an upgrade, every project the new plan has room for answers again on its own. Projects you archived stay archived until you restore them.
  • Before cancelling to Free, the Subscription page shows which limits change and the date after which older request logs and insights can be removed.

Report a problem with this page